General:
- FP10 Working Group Update, including possible future discussions on inertial confinement depending on the yet to be presented European Commission Strategy document.
- SNE letters sent to F4E
- News items:
- On the JIFS is expected from the communication team.
- W7-X campaign start announcement to be published within two weeks.
- JOREK release on GitHub.
- PWIE Annual Meeting (Cadarache).
- TE review meeting (22/9 & 25/9) and JT-60SA experimental campaign preparation
- Databases are now available on the new gateway. [It was confirmed after the meeting that the responsible officers remained the same as under PrIO]
WPTE:
- TCV and WEST are in operation
- TCV Heating limited (1 NBI + 1 Gyrotron); plan for second NBI to be back online in November.
- AUG and MAST-U on engineering break; ASDEX to restart plasma operations in November.
- Review meeting on 22nd and 25th of September; call for participation to EU devices planned for November (GPM tentatively scheduled for calendar week 46).
- EUROfusion call for JT-60SA OP2 participation to be released around October.
WPPWIE
- JET sample transport to Romania blocked at customs due to a longer-than-expected list of radioactive elements; samples returned to UK.
- Most JET tiles are below critical levels for large transport containers; only one tile requires large containers.
- ITER expressed strong interest in EUROfusion’s experience transporting nuclear materials, for their own safety case and hot cell minimization planning. A Lessons Learned report is being prepared.
- Many ITPEA presentations (next week) from the PWIE program.
- A joint TE-PWI half-day workshop on tungsten sources, influxes, and migration is being tentatively planned for October.
WPSTEL:
- First week of commissioning successful: pellet injection with improved confinement, higher temperatures, stable operation, ICRH working well following improvements made between campaigns.
- Issue regarding 30k€ mission funds to be escalated.
WPTM:
- Xavier is attending the IMEG meeting at ITER (3 days); Frank and Denis attending remotely.
- Update on TSVVs and most have planned their general workshops for the year.
- ACH training invitation received (end of September/early November); will cover IMAS, gateway access, and long-term data storage. Gloria to attend personally.
- Planning for 2027 resource review will begin in upcoming meetings.
WPSA:
- Installation of divertor VUV spectrometer and Thomson scattering diagnostics mostly complete.
- Calibration time for diagnostics is critically short; validation may extend into or after the campaign.
- Divertor cryo-pump and two MGIs are installed; MGI commissioning plan not yet available.
- Remote access/maintenance for hardware systems is formally agreed but implementation is slow.
- Experimental campaign confirmed until June.
- Next technical coordination meeting scheduled for mid-November (16/11-20/11) in Naka.
- WPSA task monitoring meeting planned for end of September/October.
- Pellet system tender ongoing; TPCI (EPFL) sending last component before end of month.
- Growing demand for real-time control expertise at JT-60SA and planning for future contributions. There are already ongoing activities on this topic led by EPFL and CREATE.
AOB
- Next meeting to include updates from the bureau on reserve list budget and SNE status
There are minutes attached to this event.