            - LMo: ITER priorities
- LMo: there are about 14 diagnostics needing Mirror Cleaning Systems.
 - need samples exposed to eroded B for mirror cleaning recipes trial
 - Some (interferometer/polarimeter, DIP/TIP) not seen as critical with Be -- > Regular boronisation now becomes challenging over lifetime
 - For new diagnostic systems without shutter -- > need samples exposed to deposited B during boronisation (Mirror station without shutter) 
 - SB: pb is the B deposits before a shutter, which may migrate to the mirror
 - VR: no B observed in AUG divertor slits/tubes (width <5mm) after campaigns
 
 - AL: Review of sample exposure/mirror stations
- focus on B related topics only
 - exposure of Mirror stations in AUG, DIII-D and TEXTOR
 - shutter on mirror stations did not work 100% reliably --> evaluation challenging, but reflectivity drop observed
 - wall conditioning dominates mirror contamination (TEXTOR, KSTAR) 
- ratio boronisation/plasma time may be different in ITER long pulses ! --> need assessment
 
 - Mirror campaign in AUG: 
- B/W/C mixed layers measured in divertor, highest below OSP
 - Reflectivity of all mirrors degraded, none of mirrors would survive in ITER without cleaning
 - not shown: mirror exposed in the mid-plane
 
 
 - LMa: Mirror Cleaning Systems:
- All 14 systems needing Mirror Cleaning will use either Pulsed-DC or RF cleaning 
 
 - All 14 systems needing Mirror Cleaning will use either Pulsed-DC or RF cleaning 
 - Discussion:
- Mirror Cleaning  techniques to be qualified to remove B and mixed layers,
- what is the effect of cleaning by sputtering
 
 - shutters have to work reliably
 - LMo: need schedule of AUG/WEST campaigns to assess possibilities for exposure of mirrors
- VR: parts from IO needed in May, closure of VV in Sept! next opening end 2025.
 - ET: VV closed in Sept, opportunity to install samples during summer
 
 - ITER DIP/TIP
- VR/ET: Si wafers could be used in AUG/WEST to get information at the location (but no info on loss of optical properties)
 - LM: need drawings from AUG/WEST --> VR/ET to provide drawings
 - meeting then needed for a more detailed planning
 
 - ET to contact WEST DIAG team to get feedback 
- on impact of B on diags (eg interfero-polarimeter)
 - on shutters
 - on ex-situ cleaning procedures
 
 - VR: analysis of B deposits on Si wafers exposed in AUG will be published next PSI Conference
 