WIMAS-2 Weekly Meeting
https://kth-se.zoom.us/j/7764082514
WIMAS-2 Weekly Meeting are technical meetings to plan and coordinate the development of the ETS-6 workflow.
Remote participation:
Minutes from the Weekly WIMAS-2 Meeting, 13 May 2020
1. Actions from last meeting
See the tab Actions from WIMAS-2 Meetings in:
https://docs.google.com/spreadsheets/d/1Ps-cGQyKNsYTObCr5Kqu58bXBNQdH45Fjpz5QD0hLB0/edit?usp=sharing
Comments:
Alexei: The question on how to handle non-quasi-neutral sources in a transport solver is a non-trivial problem that require more careful investigations.
Dave/Thomas: This is not a top priority this year.
2. FEM Solver
Alexei had a question on the conservation properties of the weak formulation. Anna will try to formulate an answer (this was formulated as an action 2 weeks ago).
Pär had comments on how to factorise the transport equations to avoid singularities. The equations in the ETS are already factorised.
ACTION:
- Anna/Thomas: Add Anna's documentation to the ETS documentation.
3. Transferring ETS-5 developments to the ETS-6
3.1. Hyper-diffusion
Dave commented that we may consider evaluating the advection term using the previous iteration instead of the previous time-step.
ACTION:
- Unknown: Test hyper-diffusion in the ETS-5 for various solutions.
- David Coster (to be confirmed): Build a standalone test bench for hyperdiffusion.
- Team: Design hyper-diffusion for the ETS-6.
- Team: Implement hyper-diffusion for the ETS-6.
3.2. Internal boundary conditions and pedestal predictions
Question: Could we make use of lessons learned from JINTRAC and ASTRA?
Answer: We seems to have fairly good understanding of how it's been implemented in JINTRAC. Dave also has a report on this. The strategy forward is to test our envisaged solution in ETS-5 and contact the JINTRAC team if needed.
Rui: The solution using a neural network problem cannot be used with pellets.
Dave: It is now important to follow up on Dmitriy's presentation.
ACTION:
- Team: Design internal boundary conditions for the ETS-6.
- Team: Implement internal boundary conditions for the ETS-6.
- Team: Implement Andreas neural network model for the edge in the ETS-6.
4. Any other business
All critical people needed for the WIMAS-2 Sprint 18-19 May 2020 are available. As it's a short sprint we'll focus on WIMAS-2.
Everyone should start preparing for 2020 and their answer to the TSVV call.